  • Concrete time for 2 & 7

    Today we were ready to concrete pads 2 & 7. We started with pad number 2. We added the weed barrier and the chicken wire on top of the sand. We brought down the wheel barrels, water and concrete to the retaining wall. We mixed the concrete until it was like a thick soup and…

  • Moving on to pad 2

    Similar to pad 7, pad 2 was another one that needed a retaining wall to prevent dirt from covering the hole. After clearing and leveling the area, we used 4 x 8 wood planks to create the retaining wall. This time we needed to go 4 high. Pad 2 also had another challenge. The pad…

  • Next up, pad 7

    Pad 7 presented a new challenge a little different from pads 5 & 9. It needed a retaining wall to prevent dirt from covering to pad once it was complete. First we cleared and leveled the area using pick axes and shovels. Once the area was level, it was time to cut the wood. We…