Framing Holes 3, 4, 6 & 8

Due to the cold weather, the project was put on hold until the temperature increased consistently to a point where we could continue setting concrete/framing. Now we’re back to work, getting prepared to lay concrete on the final 4 holes (3, 4, 6 & 8) to wrap up the project. These holes won’t be as difficult as the first 4 because of the even terrain and the easy access points that the holes provide us.